Group

Search Result – Single products

Search results

Displaying results 1 to 10 of 1076  

Innoclean Cascade-D

09/18/2025 – … operating costs and space requirements reduced; OEE improved Substantial savings on resources as regards energy, water and media Sales launch of the bottle washer planned for mid-2026 Dortmund, …

Efficient, flexible and operator-friendly

09/18/2025 – … PSL station, swivel-arm HMI panel and optimized bottle orientation system Integrable KHS Innocheck inspection technology Tool-free format changeovers for great flexibility Dortmund, September 18, …

SmartCan Eco by KHS/Ferrum

09/17/2025 – … hygiene area simplifies cleaning and saves space Modular design enables outputs of up to 135,000 cans per hour Use of fewer resources boosts efficiency and improves sustainability Dortmund, …

High performance meets energy-efficient robotics

09/17/2025 – … successfully established on the market Further developments in format changeovers and pallet conveying Innopal PLR combines palletizing and cutting-edge robot technology at the highest level …

Compact and flexible

09/16/2025 – … reel storage system for up to eight hours of labeling without operator intervention Drawer system allows label reels to be refilled during ongoing operation Compact design and flexible …

The InnoPET FreshSafe QuadBlock from KHS

09/16/2025 – … machine block for manufacture of PET bottles with integrated barrier coating Longer shelf lives and improved protection for products filled into lightweight bottles Increased line …

Powerful lightweight

09/16/2025 – … Premium LITE bottle for still water combines low weight with quality design Developed together with Husky Technologies TM especially for high-speed still water applications Focus heater …

Next-level virtual learning

09/15/2025 – … training, at any time and without extra hardware Interactive learning modules for cans, glass and PET – modules for Plasmax machines, labelers and block systems in preparation Open in-person …

In-depth understanding of customer machines

09/15/2025 – … developed service creates expertise Increase in line efficiency and system availability Individual on-site training for customers Dortmund, September 15, 2025 – With its new production line …

Sequential overhaul of filling valves

09/15/2025 – … development of the tried-and-tested service concept Shorter downtimes, down from up to two weeks to around ten hours Greater flexibility thanks to new testing equipment and adapter plate …

Displaying results 1 to 10 of 1076